Initial Renovation
The first round of renovation. The updating of finishes, lighting, and built in furniture.

At first page Next page 1-15 (of 52 found)
2003.03.14-Closing Day
2003.03.14-Closing Day  |  Total images: 3  |  Date added: 03.17.2003
2003.03.15-Demo Begins
2003.03.15-Demo Begins  |  Total images: 9  |  Date added: 03.17.2003
2003.03.16-Priming Begins
2003.03.16-Priming Begins  |  Total images: 8  |  Date added: 03.17.2003
2003.03.25-Halfwall Demo
2003.03.25-Halfwall Demo  |  Total images: 7  |  Date added: 03.26.2003
2003.03.26-Like Pulling Nails
2003.03.26-Like Pulling Nails  |  Total images: 3  |  Date added: 03.26.2003
2003.03.27-Custom China Demolition
2003.03.27-Custom China Demolition  |  Total images: 5  |  Date added: 03.30.2003
2003.03.28-LivingroomWiring-SHeetrock Begins
2003.03.28-LivingroomWiring-SHeetrock Begins  |  Total images: 6  |  Date added: 03.30.2003
2003.03.29-Sheetrock Hanging
2003.03.29-Sheetrock Hanging  |  Total images: 9  |  Date added: 03.30.2003
2003.03.31-Kitchen Take a Part
2003.03.31-Kitchen Take a Part  |  Total images: 13  |  Date added: 03.31.2003
2003.04.01-Kitchen Floor Demo
2003.04.01-Kitchen Floor Demo  |  Total images: 9  |  Date added: 04.01.2003
2003.04.04-Begin Floor Cut Back
2003.04.04-Begin Floor Cut Back  |  Total images: 3  |  Date added: 04.08.2003
2003.04.08-Cut Back Existing Planks
2003.04.08-Cut Back Existing Planks  |  Total images: 4  |  Date added: 04.08.2003
2003.04.10-Basement Flood
2003.04.10-Basement Flood  |  Total images: 6  |  Date added: 04.14.2003
2003.04.11-Tablesaw Assembly
2003.04.11-Tablesaw Assembly  |  Total images: 8  |  Date added: 04.14.2003
2003.04.12-Muddin and Sandin
2003.04.12-Muddin and Sandin  |  Total images: 4  |  Date added: 04.14.2003