Master Bedroom, Bath, Walk-in Closet, and Mud Room - 700 Square Feet
Page 1
Page 2
Page 3
Page 4
16-30 (of 0 found)
2005.09.09-Windows
| Total images: 43 | Date added: 6/13/07 9:06 PM
2005.08.11-Tub Arrives
| Total images: 4 | Date added: 6/13/07 9:05 PM
2005.05.30-Floor Sleepers Begin
| Total images: 30 | Date added: 6/13/07 9:04 PM
This allows for an insulated floor that is level with rest of the house.
2005.06.08-Sheathing
| Total images: 2 | Date added: 6/13/07 9:03 PM
The plywood goes on the framing.
2005.05.28-Framing Begins
| Total images: 18 | Date added: 6/13/07 9:03 PM
The space starts to take shape.
2007.05.05-Shower door installation
| Total images: 9 | Date added: 5/14/07 2:22 PM
2007.03.27-Shower Shots
| Total images: 5 | Date added: 5/14/07 1:06 PM
2007.03.10-Mud Room Door
| Total images: 8 | Date added: 5/14/07 1:06 PM
2007.03.03-Shower Grout
| Total images: 13 | Date added: 5/14/07 1:06 PM
2006.12.01-Bringing in Sheetrock
| Total images: 20 | Date added: 5/14/07 1:06 PM
2007.04.11-Mudroom Tile
| Total images: 5 | Date added: 4/19/07 10:56 PM
2007.01.28-Shower Stone Install - Part 2
| Total images: 12 | Date added: 4/19/07 10:54 PM
2007.01.27-Shower Stone Install - Part 1
| Total images: 7 | Date added: 4/19/07 10:51 PM
2006.11.25-Shower Flashing
| Total images: 8 | Date added: 3/31/07 7:21 PM
2005.08.06-Framing
| Total images: 13 | Date added: 1/4/07 12:48 PM
Page 2 of 4